US 9,747,565 C1 (13,101st)
System and methods for management of mobile field assets via wireless handheld devices
Frank A. Barbosa, Carrollton, TX (US); and Luis M. Ortiz, Albuquerque, NM (US)
Filed by INTELLECTUAL VENTURES II LLC, Wilmington, DE (US)
Assigned to FLEET CONNECT SOLUTIONS LLC, Austin, TX (US)
Reexamination Request No. 90/019,774, Dec. 13, 2024.
Reexamination Certificate for Patent 9,747,565, issued Aug. 29, 2017, Appl. No. 15/071,003, Mar. 15, 2016.
Application 14/480,297 is a division of application No. 13/925,692, filed on Jun. 24, 2013, granted, now 8,862,184.
Application 90/019,774 is a continuation of application No. 14/480,297, filed on Sep. 8, 2014, granted, now 9,299,044.
Application 13/925,692 is a continuation of application No. 12/547,363, filed on Aug. 25, 2009, granted, now 8,494,581.
Application 12/547,363 is a continuation of application No. 11/262,699, filed on Oct. 31, 2005, granted, now 7,593,751.
Application 11/262,699 is a continuation of application No. 09/955,543, filed on Sep. 17, 2001, granted, now 6,961,586.
Claims priority of provisional application 60/233,120, filed on Sep. 18, 2000.
Ex Parte Reexamination Certificate issued on Nov. 26, 2025.
Int. Cl. H04W 64/00 (2009.01); G06Q 10/06 (2023.01); G06Q 10/0631 (2023.01); G06Q 10/08 (2024.01); G06Q 10/087 (2023.01); G06Q 50/08 (2012.01); G06Q 50/30 (2012.01); G06Q 50/40 (2024.01); H04L 29/08 (2006.01); H04L 67/1095 (2022.01)
CPC G06Q 10/063114 (2013.01) [G06Q 10/06 (2013.01); G06Q 10/063118 (2013.01); G06Q 10/08 (2013.01); G06Q 10/087 (2013.01); G06Q 50/08 (2013.01); G06Q 50/40 (2024.01); H04L 67/1095 (2013.01); H04W 64/00 (2013.01)]
OG exemplary drawing
AS A RESULT OF REEXAMINATION, IT HAS BEEN DETERMINED THAT:
The patentability of claims 1-15 is confirmed.
1. A method, comprising:
accessing a template stored on a server located remotely from a handheld device, the template listing tasks to be completed before an end of a work shift;
reporting a status of each of the tasks at least once by synchronizing the handheld device to the server; and
updating the template responsive to the status with unfinished or new tasks at the end of the work shift.